The new LCBO store at 1838 Avenue Road Toronto Ontario, Aerostar was involved in all the electrical installation stages from the temporary power supply, rough-in and in concrete conduit layout to finishing. Also, installation of numerous architectural feature and in cabinet lighting.
Industrial Project
Industrial Project
Vaughan Mills Mall warehouse project. Aerostar in this project installed main distribution panel, run the EMT conduits and, outlets, lighting fixtures, controllers, transformers and timers for lighting.
Commercial Project
Commercial Project
340 The East Mall conversion was a conversion of Delta circuit to Wye circuit as part of the Toronto Hydro projects. This project involved the conversion of existing Delta 600 V 3 wire to 3 Phase 4 wire introducing a fourth wire between the consumer service entrance switch and utility company supply transformation.